Sacristy Tour - September 16 & 17

Posted on September 12, 2017 in: General News

Sacristy Open House 

Following the 5 pm Mass on Saturday, September 16, and the Noon Mass on Sunday, September 17, you are invited to walk through the sacristy to see the renovations. 

The first part of the work was completed in 2012 with a new roof. We now have insulation above the ceiling, replastered walls, many electric outlets, custom built cabinetry, upgraded electrical panel, half bath, work area for sacristans, designated sinks, and a refinished wood floor and cabinetry that were original to the sacristy. 

Our 1874 church was built without a sacristy, only added 35 years later. 

The sacristy and its windows were donations from parishioners. 

We've paid for the renovations the same way, contributions to the historic preservation of the church. 

Thank you for your gifts to the heritage of our church.